"There is no power for change greater than a community discovering what it cares about"
Pedestrian Bridge
"As much as it is a pleasure walking around Downtown Roanoke, it is risky to walk on the narrow side walks on Elm Ave, south of Elm Wood Park to get to South East Roanoke".
- Preethi (an ELA 2022 Class Member and resident of Roanoke)

Immediate Impact
For our first site specific proposal, we would like to propose a pedestrian and bike friendly path to connect East and West Roanoke. As stated earlier, the addition of I-581 or Route 220 physically divided East and West Roanoke. This made it hard for folks to commute to and from downtown Roanoke and limited their access to valuable resources such as the Hospital and medical clinic located in West Roanoke.
When the current bridge on Elm Ave. was built over 581, it connected east and west Roanoke again. The bridge was a vital addition to Roanoke, and it became the busiest and most used thruway in the city. However the bridge doesn’t support pedestrian and bike traffic to the fullest.
Therefore we would like to propose these immediate impacts that can be implemented by the City of Roanoke.
Some of the immediate impacts are as follows: (Figure 1)
-
Improving the pedestrian walking path by creating a barrier between vehicles and people, incorporating bollards or a concrete wall.
-
Adding sufficient lighting for pedestrian use.
-
Adding proper signage and refinishing existing crosswalks, so they’re visible
-
Adding green paint for a shared vehicle and bike lane.
These immediate changes, no matter how small, will give the residents of Belmont-Fallon a safer and more comfortable connection to downtown Roanoke.

Figure 1
Long-Term Impact
Our long term vision for connecting East and West Roanoke involves a new pedestrian bridge. The bridge would connect walking paths of Bullitt Ave SE over interstate 581, making downtown more accessible to the residents of Belmont Fallon. The new walking route avoids high speed roads and has a limited amount of crosswalks compared to the existing route.
​
This long-term vision would separate pedestrian traffic from vehicular traffic and connects Elmwood Park to our proposed park at the West Gateway Site


Sketch and plan view of Long-Term Vision Pedestrian Bridge
Sketch and plan view of Long-Term Vision Pedestrian Bridge
Sketch and plan view of Long-Term Vision Pedestrian Bridge

Sketch of Long-Term Vision Pedestrian Bridge
